Grand County Wildfire Council
Fraser River Fuels Project
Fraser River Fuels Project Overview
Grand Fire Protection District No. 1 and the Grand County Wildfire Council (GCWC) are pleased to be recipients of multiple grant awards through the Colorado Department of Natural Resources' Colorado Strategic Wildfire Action Program (COSWAP). This funding is being used for forest treatments aimed at wildfire mitigation, community risk reduction, & watershed protection on private lands near the Fraser River, north of the town of Tabernash.
Phase 1 of the Fraser River Fuels Project was completed from 2022 to 2024 in the Granby Ranch and Ten Mile Creek areas. Phase 2 will take place from 2025 to 2027 in the Granby Ranch and Winter Park Highlands areas. See below for additonal project details, maps of completed and proposed work, & details on how eligible property owners can participate.

Phase 1
Details Coming Soon
Phase 2 - Granby Ranch (2026)
The start of phase 2 consists of roughly 203 acres of mechanical treatment on Granby Ranch Ski Area property. These treatments utilize large forestry/logging equipment to remove timber from beetle-killed lodgepole pine stands. This work is done with the goals of reducing hazardous fuel loading in the Wildland-Urban-Interface (WUI), promoting healthy forest regeneration, and lowering potential soil burn severity to reduce debris flows and runoff into the Fraser River.
Phase 2 Granby Ranch work will continue in 2027, with about 65 acres of steep terrain slated for treatment utilizing hand cut & pile methods. Grand Wildland Team crews will then burn the piles during the winter season to remove the fuel from the landscape.
Phase 2 - Winter Park Highlands (2027)
Phase 2 work will wrap up in 2027 with the Winter Park Highlands subdivision, located directly south of the Granby Ranch Ski Area. This area has hundreds of homes located on steep slopes and surrounded by hazardous levels of fuel loading. The goal is to treat approximately 100-150 acres within the neighborhood, utilizing a mix of hand cutting and small machinery.
This portion of the project is still in planning, the proposed treatment map can be viewed using the button below. All properties that have expressed interest in participating in the project should be shown on the map and have received an email on October 29th, 2026. If you did not receive this email - or your property is not shown on the map but you are interested in participating - please reach out to